We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
  • ::COVID-19 COVERAGE::
  • INDUSTRY PRESS ROOM
  • SUBMISSIONS
  • MEDIA FILE
  • Create Account
  • Sign In
  • Sign Out
  • My Account
Free Newsletters
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
  • STRATEGY
  • GLOBAL
  • LOGISTICS
  • MANUFACTURING
  • PROCUREMENT
  • VIDEO
    • News & Exclusives
    • Viewer Contributed
    • Upload your video
  • PODCAST ETC
    • Podcast
    • White Papers
    • Webcasts
    • Events
    • Blogs
      • Reflections
      • SCQ Forum
    • Mobile Apps
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
  • STRATEGY
  • GLOBAL
  • LOGISTICS
  • MANUFACTURING
  • PROCUREMENT
  • VIDEO
    • News & Exclusives
    • Viewer Contributed
    • Upload your video
  • PODCAST ETC
    • Podcast
    • White Papers
    • Webcasts
    • Events
    • Blogs
      • Reflections
      • SCQ Forum
    • Mobile Apps
Home » Panel Built, Inc. Scale Houses Provide a Comfortable Work Environment in a Fraction of the Time
Press releases are provided by companies as is and have not been edited or checked for accuracy. Any queries should be directed to the company issuing the release.

Upload your press release

Panel Built, Inc. Scale Houses Provide a Comfortable Work Environment in a Fraction of the Time

February 22, 2019
No Comments

Panel Built, Inc., a modular construction company, now provides prefabricated scale houses that provide scale operators with a calm, comfortable environment to work in. Thanks to Panel Built's panelized wall system, the scale houses can be designed and engineered to 100% meet customer specifications. However, since the buildings are fabricated in one of our modular construction facilities, the buildings are quickly and easily installed on site.
The pre-assembled version of Panel Built's scale houses are constructed atop a forkliftable steel base, allowing the building to be easily transported after being delivered to the site. Once on site, the building only needs to be moved to its final location, unwrapped, anchored into the concrete pad, have pre-packaged HVAC system installed, and hooked up to an electrical source. At this point, the building should be ready for use. In some cases, pre-assembled scale houses can have dimensions that make shipping impossible. In this scenario, the scale houses are delivered in a "knock down" state and assembled on site.
Overall, Panel Built prefabricated buildings provide a quick, comfortable, and durable space solution for your scale house needs. With over 20 years experience in the modular construction industry, Panel Built, Inc. has the experience and know how to get the job done right. Panel Built works with their dealers and end customers to ensure their structures fits their needs perfectly.

More Info: https://www.panelbuilt.com/scale-houses/

Submit your logistics, material handling, or supply chain related company news in Supply Chain Quarterly's's Industry Press Room section or New Products section
  • Related Articles

    Panel Built, Inc. Cashier Booths Provide a Quick, Comfortable Work Space

    Panel Built, Inc. Modular Mezzanines Double You Space In a Fraction of the Time

    Panel Built, Inc. Modular Mezzanines Double Your Space in a Fraction of the Time

You must login or register in order to post a comment.

Report Abusive Comment

Most Popular Articles

  • How to resolve your inventory dilemma

  • Container prices continue to drop

  • Regionalized supply chains: the key to resilience

  • Warehouse vacancy rates sink to 27-year low

  • Empty shipping containers stack up at U.S. port depots

Featured Video

Cccb7d13 710a 4473 8132 da8b6cc286f1

The Sportsman's Guide Case study: Increasing Accuracy & Productivity

Viewer Contributed
Thanks to the Lucas Warehouse Optimization Suite, The Sportsman's Guide has increased productivity, reduced training time, and experienced a boost in accuracy for both full-time staff and seasonal employees. Want to learn how Lucas can help your DC be more efficient, accurate, and safe while reducing labor costs?...

FEATURED WHITE PAPERS

  • Case Study: Peak Teams helps boost headcount quickly on a short-term project

  • Breaking Bad: Conducting Full Truckload RFPs in the Age of Digital Freight Procurement

  • Omnitracs One – Last Mile Solutions

  • The enterprise shipper's guide to building a smarter truckload RFP

View More

Subscribe to Supply Chain Quarterly

Get Your Subscription
  • SUBSCRIBE
  • E-NEWSLETTERS
  • ADVERTISING
  • CUSTOMER CARE
  • CONTACT
  • ABOUT
  • STAFF
  • PRIVACY POLICY

Copyright ©2022. All Rights ReservedDesign, CMS, Hosting & Web Development :: ePublishing